Solar equipment should remain on a roof for decades. Installing a solar array over a roof that is already approaching the end of its useful life can create substantial removal and reinstallation costs when the roof eventually needs replacement.
Before the solar array layout and attachment plan are finalized, evaluate both the condition of the roofing and whether the roof structure is suitable for the additional loads and attachment method.
A visual inspection can identify problems, but it is not a structural certification or a substitute for a professional roof inspection when conditions are uncertain.
Start by gathering as much information as you can about the existing roof:
If you do not know when the roof was installed, check your home-improvement records, previous-owner records, or local building department. Roofing permits may help establish when major roof work was completed.
Solar panels are long-lived equipment, so installing them over roofing that will soon need replacement can create unnecessary work and expense.
As a general screening rule, the roof should have substantial useful life remaining before installing solar. DOE solar pre-assessment guidance has used approximately 10–15 years of remaining shingle life as one roof-readiness criterion.
That does not mean every roof with less than 10–15 years remaining must be replaced. Roof condition, roofing type, replacement cost, solar mounting method, and the cost of removing and reinstalling the array should all be considered.
If the roof is already nearing replacement, reroofing before solar installation is often the more practical choice.
From a safe location, look for visible signs of deterioration or damage, including:
Do not walk on a roof that appears damaged, unstable, unusually fragile, wet, icy, or otherwise unsafe.
Some roofing materials—including certain tile, slate, wood, and specialty roofing—can be damaged simply by walking on them incorrectly. When in doubt, have a roofer inspect the roof.
Where safely accessible, inspect the attic and ceilings below the proposed array area.
Look for:
Do not alter, drill, notch, or cut roof framing to make room for solar equipment unless the modification is specifically permitted by the approved design.
A roof can look perfectly healthy and still require structural verification before solar is installed.
The roof must be capable of supporting the applicable loads, which can include:
Solar-ready guidance from the U.S. Department of Energy specifically calls for code-compliant documentation of allowable roof dead and live loads when evaluating a structure for PV.
Your permitting authority or solar design package may require structural calculations or an engineer's review even when no damage is visible.
The solar attachment system must be compatible with:
Do not assume that an attachment designed for asphalt shingles is suitable for tile, metal, slate, membrane, or other roofing systems.
Also check whether penetrating the roof could affect an existing roofing warranty.
The array should not interfere with normal roof drainage or create unnecessary maintenance problems.
Before finalizing the layout, identify:
Required access pathways and setbacks vary by jurisdiction and roof configuration and should be addressed in the permitted solar design.
Have a qualified roofer evaluate the roof when:
A roofer can evaluate the roofing system and waterproofing condition, but that is not necessarily the same as determining the structural capacity of the building.
Additional structural evaluation may be appropriate or required when there is:
The solar permit package may already include the required structural calculations. Follow the approved plans and local permitting requirements.
Consider repairing or replacing the roof before solar when its expected remaining life is substantially shorter than the expected life of the solar system.
Ask yourself:
Is it reasonable to expect this roof to remain serviceable for many years after the solar installation?
If the answer is uncertain, compare the cost of reroofing now with the future cost of:
For a roof already close to replacement, completing the reroof first is often simpler.
A roof can look good and still require structural verification.
A visual assessment helps identify obvious problems, but it does not certify the roof's load capacity or guarantee that the roofing will remain watertight after solar attachments are installed.
When the roof's condition, remaining life, structure, or attachment details are uncertain, obtain guidance from the appropriate roofer, structural professional, solar designer, or permitting authority before loading or penetrating the roof.