Phase 3 focuses on everything that happens after the panels and equipment are physically installed—the final steps that bring the system online, pass inspections, and get permission to operate. This stage closes out the project and transitions the homeowner from installation to active solar production.
Phase 3: Post‑Installation
Inspect, Connect & Activate
This phase ensures the system is safe, connected, and ready for utility approval. All wiring, breakers, grounding, and equipment connections are verified before the system is energized.
Commissioning Checklist
A technician or homeowner completes the final system checks:
This step ensures the system is technically sound before going online.
Wi‑Fi & Network Setup
Monitoring is activated so the system can report production data. This includes:
A successful network setup allows both the homeowner and support team to track system performance.
Inspections & PTO
The final step is utility and city approval:
This is the official “green light” that activates full system operation.