Click Here for a video walk through
Your kit supplies the major components of the designed system. Your local materials complete the installation for your particular roof, wiring route, electrical service, or ground-mount foundation. Use your order and packing list to identify supplied equipment, and use your plan set to determine the additional materials and specifications your project requires.
The exact equipment depends on your system configuration. The following summarizes the main inclusions and purchasing responsibilities.
| Item | Included or purchased separately? |
|---|---|
| Solar plan set | Included with every complete system |
| Solar panels and specified inverter or microinverters | Included as specified in your order |
| Roof attachments and racking for a standard roof-mounted Enphase system | Included for the specified roof and design |
| Enphase IQ Combiner | Included with the standard Enphase system |
| Enphase IQ/Q trunk cable and branch terminators | Included for the array layout |
| Enphase watertight caps or extra cable drops | Included where needed for the project |
| Enphase array junction-box cable glands/strain reliefs | Included |
| PV wire with MC4 connectors for the run to the array junction box | Included for applicable PV string systems |
| Array junction box | Purchased separately |
| Home-run wiring, conduit, fittings, and straps | Purchased separately |
| Breakers | Purchased separately |
| IMO rotary DC disconnects | Included when specified on the plans |
| AC disconnects, fused or non-fused | Purchased separately whenever required |
| IronRidge ground-mount racking components | Included for the designed ground-mount system |
| Ground-mount support pipe and concrete | Purchased separately |
| Standard solar NEC PV labels kit | Included with every kit |
| Custom site placard showing the property and disconnect locations | Purchased separately |
Plan to purchase the array junction box and the materials for the wiring run from that box to the inverter or IQ Combiner. This run is often called the home run. Its length and routing depend on your property, so these materials are sourced locally.
A standard Enphase system includes the roof attachments, racking, panels, microinverters, and IQ Combiner. It also includes the IQ/Q trunk cable, Enphase branch terminators, and any project-specific watertight caps or extra cable drops needed to complete the array cable arrangement and bring it to an array junction box.
The cable glands or strain reliefs for entering that junction box are included. The junction box itself is not included.
From the array junction box to the supplied IQ Combiner, purchase the required wire, conduit, conduit fittings, and supports separately. Additional wiring and electrical materials between the IQ Combiner and the home's electrical connection are also purchased separately as shown in the plans.
For applicable PV string systems, we include PV wire with MC4 connectors to reach a junction box at the array. The junction box, home-run wiring, and conduit from the array to the inverter are purchased separately.
Use the wiring method and conductor specifications shown in your plan set. The included array cable does not replace the separately purchased wiring needed to complete the route to the inverter or electrical service.
Build your electrical shopping list from the final plan set and measured installation route. Common items include:
Home-run and other building wire, plus separately required grounding conductors.
Conduit, elbows, sweeps, couplings, connectors, straps, bushings, hubs, and expansion fittings where specified.
Array junction boxes and any additional junction boxes, pull boxes, or wireways.
Weatherproof fittings and entry hardware beyond the included Enphase array cable glands.
Breakers and required panel accessories.
Required AC disconnects, whether fused or non-fused.
Subpanels, grounding bars, and service-connection hardware shown in the plans.
General mounting fasteners, anchors, sealant, and firestop materials needed for the installation.
An IMO rotary DC disconnect shown on your plans is supplied. An AC disconnect shown on your plans is purchased separately. If the design calls for a fused AC disconnect, include the specified fuses in your purchasing checklist and verify whether they are included with the disconnect you buy.
Match purchases to the plans and equipment instructions. In particular, verify breaker compatibility with the exact panel or enclosure and confirm the specified disconnect type and ratings before ordering.
For a standard roof-mounted package, the roof attachments and racking for the specified design are included. Check those components against the actual roof before installation. If the roof type or attachment requirements differ from the order, contact us to resolve the difference before purchasing replacement hardware.
Site-specific construction materials are purchased separately when needed. These may include roof repair materials, structural blocking or lumber, reinforcement shown by engineering, equipment pads, wall anchors, or protective barriers.
The supplied mounting equipment does not include materials needed to repair or modify the existing building. Review the structural and mounting pages of your plans for those requirements.
For an IronRidge ground-mounted system, we include the IronRidge racking components specified for the design. The 2-inch or 3-inch support pipe and the concrete used to secure the vertical pipes are not included and must be purchased locally.
Use the exact pipe size, material specification, lengths, and foundation details shown in your engineered plans. The two pipe sizes are design options, not interchangeable choices. Check your plans for site specific details.
Other locally sourced materials or services may include:
Rebar, forms, and aggregate where specified.
Trenching materials, conduit sweeps, warning tape, and grounding electrodes where required by the plans.
Excavation, compaction, and concrete-placement equipment or contractor services.
Confirm the foundation design and layout before ordering pipe or concrete quantities.
Every kit includes a standard solar NEC PV labels kit. This contains all or most of the standard labels needed for a project, depending on the edition of the National Electrical Code adopted locally.
Compare the supplied labels with the labeling pages in your plan set. The local authority having jurisdiction (LAHJ), typically your local permitting or inspection authority, may request additional labels or wording. Purchase any required labels that are not in the supplied kit separately.
A custom site placard is not included. This is the property-specific placard showing the address and the locations of disconnects relative to the main service panel. Source it separately from PVLabels.com or an equivalent supplier, using the final approved layout and required wording.
Rapid-shutdown equipment, initiators, emergency-stop buttons, signal cables, and communications accessories vary by system. Check your order, packing list, and equipment schedule to determine whether each required item is supplied separately, integrated into another component, or still needs to be purchased. If rapid shutdown is required, the equipment will be provided to accomplish it
If an item's inclusion is unclear, contact us before ordering it. This is especially useful for gateway or communications functions that may already be part of supplied equipment.
Start with your order and packing list. Mark the equipment and accessories already supplied.
Review the equipment schedule and racking bill of materials. Identify required items that are not on the packing list.
Trace the single-line diagram (SLD). Follow each connection from the array through the inverter or IQ Combiner to the electrical service. Account for the boxes, conductors, conduit, disconnects, and protective devices along that route.
Check the other plan pages. Review structural, mounting, foundation, trenching, grounding, and labeling details.
Measure the actual route. Determine lengths and quantities after confirming equipment locations and routing.
Assign purchasing responsibility. Mark each item as “included,” “local purchase,” “contractor supplied,” or “confirm with gigawatt.”
Use the plans to establish what is required and the packing list to establish what is supplied. An item appearing on the plans does not, by itself, mean it is included in the kit.
Hold off on affected purchases when:
Permit corrections could change the equipment or installation details.
The wiring route or equipment locations have not been finalized and measured.
The supplied roof attachment does not match the actual roof conditions.
A breaker has not been verified for the exact panel or enclosure.
Disconnect ratings, fuse requirements, or service-connection details remain unresolved.
Ground-mount pipe or foundation specifications are not final.
The layout for a custom site placard could still change.
If you are unsure whether an item is supplied, contact us with the item description and its reference in your plans or equipment schedule before purchasing it.