Electrical Safety Considerations Before Solar Installation

Electrical Safety Considerations Before Solar Installation

Solar equipment can have multiple independent sources of electrical energy, including the utility, photovoltaic modules, batteries, generators, and backup-power equipment.

Turning off the home's main breaker does not automatically make every solar-system conductor or piece of equipment safe to touch.

PV modules can produce electrical voltage whenever they receive sufficient light. Batteries store electrical energy and can supply very high current during a fault. Backup and generator systems can also energize circuits when utility power is unavailable.

Never assume a circuit is de-energized based only on the position of a breaker, switch, or disconnect.

Know every source of electrical energy

Before electrical work begins, the person performing the work should understand the approved single-line diagram (SLD) and identify all applicable energy sources and disconnecting means.

These may include the utility service and main disconnect, PV circuits, microinverter AC branch circuits, string-inverter DC inputs, battery conductors and disconnects, generators, transfer equipment, and backup-load panels.

Some circuits can be energized from more than one direction. OSHA specifically recognizes that backfeed or induced voltage can result in voltage being present even where a circuit was believed to have been de-energized.

If the installed equipment or field wiring does not match the approved SLD, stop and resolve the discrepancy before continuing.

Establish  electrically safe working conditions

Work that requires establishing or verifying an electrically safe condition should be performed only by someone qualified to recognize the electrical hazards and perform the required testing.

The general process includes:

  1. Identify all possible electrical energy sources.
  2. Shut down equipment using the manufacturer's required sequence.
  3. Operate the appropriate disconnecting means.
  4. Apply required lockout/tagout or other energy-control measures.
  5. Release, disconnect, or otherwise control stored energy as required.
  6. Use appropriately rated test equipment to verify the absence of voltage at the required points.
  7. Confirm that the test instrument functions correctly before and after the absence-of-voltage test.

This last step is sometimes called a live-dead-live test. NFPA 70E's absence-of-voltage procedure calls for verifying that the test instrument operates satisfactorily on a known voltage source before and after the test.

Testing must account for every relevant source, conductor, phase, and circuit appropriate to the equipment being worked on.

Do not use this overview as instructions for performing electrical testing if you are not qualified to do so.

A breaker or disconnect in the OFF position does not, by itself, prove the absence of voltage.

Understand the limits of solar shutdown

Solar electrical systems require extra caution because PV modules themselves are energy sources.

Illuminated PV modules continue to produce electrical output.

Depending on the system, rapid-shutdown equipment or other disconnecting means may reduce voltage in specified portions of the PV system, but this should never be interpreted to mean that every module, conductor, terminal, or enclosure is electrically safe.

Follow the shutdown and servicing instructions for the specific inverter, microinverter, battery, rapid-shutdown equipment, and other components installed at the site.

Handle PV connectors correctly

PV connectors require particular care.

Keep unused or disconnected connectors protected from dirt, moisture, damage, and contamination until they are ready for the intended connection.

Do not disconnect a PV DC connector while it is carrying current.

Use only connector combinations permitted by the equipment and connector manufacturers.

Connectors that look alike are not automatically compatible.

Use the specified contacts, assembly procedure, and tooling for the connector system being installed. Improper connector mating or termination can create increased resistance, overheating, arcing, and fire hazards.

Follow torque specifications

Electrical terminals must be tightened according to the equipment manufacturer's instructions.

Both under-torquing and over-torquing can create problems.

Loose connections can increase resistance and heat. Excessive torque can damage terminals, conductors, bus structures, or equipment.

Use a torque tool appropriate for the required value whenever the manufacturer specifies a tightening torque.

Do not tighten electrical connections by feel when a specified torque value is provided.

Stay out of utility-controlled equipment

Do not enter, modify, or remove seals from utility-controlled equipment unless you are specifically authorized to do so.

This can include:

  • Utility meter compartments
  • Sealed meter sections
  • Service conductors
  • Utility-side terminals
  • Other utility-controlled portions of service equipment

Removing the meter is not a DIY method of disconnecting utility power.

Service equipment can also contain conductors that remain energized even when the home's main breaker is turned off.

Use appropriate electrical tools and PPE

Electrical work requires tools, test equipment, and personal protective equipment appropriate for the actual voltage and hazard.

A meter must be rated for the system and environment in which it is being used.

Insulated tools and electrical PPE may be required for certain tasks, but they are not substitutes for de-energizing equipment when de-energization is required or possible.

Do not work on energized electrical equipment simply because insulated tools or gloves are available.

Treat batteries as an independent energy source

Battery systems remain an electrical energy source even when utility power and solar production have been disconnected.

Follow the battery manufacturer's required:

  • Transportation and handling instructions
  • Installation sequence
  • Shutdown procedure
  • Disconnect procedure
  • Energization procedure
  • Required PPE and tools

Keep batteries in the manufacturer's required shipping, installation, or standby state until the mounting location and electrical installation are ready.

Do not open, modify, bypass, or energize battery equipment outside the manufacturer's installation procedure.

Know when electrical work requires a professional

Electrical licensing and homeowner-permit rules vary by jurisdiction.

Use a properly licensed or otherwise qualified electrical professional whenever required by local law or when the work exceeds your training or ability to perform it safely.

Professional involvement is particularly important for work involving service equipment, meter-main equipment, supply-side connections, panel replacements or upgrades, generator and transfer equipment, battery-storage equipment, troubleshooting energized equipment, or significant changes from the approved electrical design.

Stop when something does not match

Never use trial and error to determine how electrical equipment should be connected or energized.

Stop work when:

  • The installed equipment does not match the approved SLD.
  • A conductor cannot be positively identified.
  • An unexpected voltage is present.
  • A required disconnect cannot be located.
  • The manufacturer's shutdown or energization sequence cannot be followed.
  • Equipment appears damaged or improperly installed.
  • The required electrical test cannot be performed safely.
  • You are unsure whether equipment is actually de-energized.

When in doubt, treat the equipment as energized until a qualified person establishes otherwise.