Creating a Local and Online Purchasing Checklist

Creating a Local and Online Purchasing Checklist

Click Here for video walk through 


Creating a Local and Online Purchasing Checklist
Every complete system includes a solar plan set and the specialty solar equipment specified in your order. Your purchasing checklist should cover the additional materials needed to complete the installation at your property.

Start by identifying what is already supplied. Then divide the remaining items between local stores and solar or electrical specialty suppliers. Choose the source based on availability, exact product requirements, delivery time, freight cost, and return policies. A local electrical supply house may also be the best source for specialty equipment.

Start with what is already included

Compare your order and packing list with the latest plan set before creating a shopping list. Keep supplied items on your master materials list, but mark them as included so you do not purchase them twice.

Remember these kit inclusions and exclusions:

  • Array equipment: The panels, inverter or microinverters, and racking are supplied as specified in your order. Check the packing list before buying additional racking components or accessories.

  • Array wiring: Applicable PV string systems include PV wire with MC4 connectors to reach the array junction box. Enphase systems include the specified IQ/Q trunk cable, branch terminators, project-specific caps or extra cable drops, and array junction-box cable glands.

  • Junction boxes and home runs: The array junction box and the wire, conduit, fittings, and straps for the run to the inverter or supplied IQ Combiner are purchased separately.

  • Disconnects and breakers: IMO rotary DC disconnects are included when specified on the plans. Required AC disconnects—fused or non-fused—and breakers are purchased separately.

  • Ground mounts: The specified IronRidge racking components are included. The design's 2-inch or 3-inch support pipe and foundation concrete are purchased locally.

  • Labels: A standard solar NEC PV labels kit is included. Custom site placards and any additional labels required for your project are purchased separately.

An item appearing on the plans means it is required for the installation; it does not necessarily mean it is supplied in the kit. Contact us if an item's purchasing responsibility is unclear.

Materials usually purchased locally

Local purchasing is often practical for bulky, heavy, or commonly stocked materials. It can reduce freight costs and make exchanges easier when field quantities change.

  • EMT, PVC, or rigid conduit as specified, along with elbows, sweeps, couplings, straps, and common fittings.

  • Building wire with the type and ratings specified by the plans, including THHN/THWN-2 where specified.

  • Junction boxes, pull boxes, and required weatherproof fittings.

  • Grounding conductors and common grounding hardware specified for the project.

  • Compatible breakers, retaining kits, and panel accessories when the exact required products are stocked locally.

  • Required lockable knife-blade AC disconnects and, for fused models, the specified fuses.

  • Ground-mount support pipe, concrete, rebar, gravel, and trench materials shown in the design.

  • General fasteners, anchors, sealants, and firestop materials appropriate for the installation.

Use the plans to identify the required specifications before requesting prices. Measure the confirmed wiring route before purchasing cut wire or ordering conduit quantities. For ground mounts, use the exact pipe and foundation specifications shown in the engineered design.

Materials to source from solar or electrical specialty suppliers

Specialty suppliers, whether local or online, are useful when an item requires a particular manufacturer, model, certification, or system compatibility.

The following are sourcing examples, not a list of additional items every customer needs to buy. Check kit contents first.

  • Additional PV wire or factory-terminated extensions required by an approved change.

  • Additional or replacement PV combiners and DC disconnects specified by the design.

  • Manufacturer-specific breakers, retaining kits, current transformers (CTs), gateways, or communications accessories that are not already supplied.

  • Rapid-shutdown devices or initiators, after confirming whether they are included or integrated into supplied equipment.

  • Custom site placards and supplemental labels beyond the included PV labels kit.

  • Additional racking splices, clamps, bonding hardware, wire clips, or roof attachments required by an approved change.

  • Specified battery cables and protection equipment for battery projects, after checking the order for included components.

Custom site placards can be sourced from PVLabels.com or an equivalent supplier. Use the final approved property layout, address, and disconnect locations when ordering.

For online purchases, verify the complete model number, included accessories, stock status, delivery estimate, and return terms. Compare the total delivered price rather than the item price alone.

Build a materials takeoff worksheet

A materials takeoff is an itemized list of the parts and quantities needed to build the project. Use one worksheet to track supplied equipment, local purchases, online orders, and contractor-supplied materials.

ColumnWhat to record
Plan referenceSheet, SLD segment, mounting detail, or equipment-schedule entry
Item descriptionPlain-language description and intended use
Manufacturer and modelExact part number where specified; required certification or compatibility
Size or ratingDimensions, conductor size, voltage, current, enclosure type, or other specified requirement
Quantity and unitRequired quantity in feet, pieces, bags, or the applicable unit
Purchasing responsibilityIncluded in kit, customer purchase, contractor supplied, or confirm
SourceSupplier and product link or quote reference; local or online
Order and deliveryOrder date, order number, and expected arrival
Received and verifiedQuantity received, model/rating checked, and condition confirmed
Return deadlineLast return date and any restrictions or restocking fees
Notes or approved substitutionOutstanding questions and documented approvals

Use separate rows for separately purchased accessories. For example, track an AC disconnect, its required fuses, and any separately sold hub or grounding kit individually.

Purchasing rules

  1. Purchase against the latest plans. Reconcile the worksheet after permit corrections or approved design changes. Pause purchases of affected items until the changes are resolved.

  2. Match the specified equipment. Use exact model numbers where required. Verify breakers and accessories for the specific panel or enclosure before ordering.

  3. Confirm substitutions before purchase. Do not mix connector brands or substitute electrical protection based on appearance, physical fit, or an online compatibility claim. Refer proposed changes to the system designer for verification and approval.

  4. Coordinate with your contractor. Identify who is supplying each item so it is neither omitted nor purchased twice.

  5. Check return terms before ordering. Cut wire, custom placards, special-order equipment, and opened products may have restricted returns. Keeping an item until inspection does not extend its return window.

  6. Inspect deliveries promptly. Check quantities, model numbers, ratings, accessories, and damage while return or claim options remain available. Keep receipts and packaging through inspection where practical.

  7. Order in the right sequence. Once specifications are settled, prioritize items with long delivery times. Purchase measured local materials after the route is confirmed, and order custom placards after the final layout is established.

Final purchasing check

  • The worksheet matches the latest plan revision.
  • Every SLD segment has its required materials assigned.
  • Every mounting, structural, and foundation detail has its required materials assigned.
  • Included kit items are marked and excluded from new purchase quantities.
  • Array junction boxes, home-run materials, breakers, and required AC disconnects are accounted for.
  • Contractor-supplied items have a confirmed owner.
  • Specialty items with long delivery times are scheduled for ordering once specifications are final.
  • Wire and conduit quantities reflect the confirmed route.
  • The included label kit has been checked against the plans, with supplemental labels and the custom site placard accounted for.
  • Return deadlines, delivery dates, and unresolved questions are recorded.

Before placing an order, resolve any item marked “confirm.” A complete purchasing list identifies what is needed, who will supply it, and which exact product belongs in the installation.