A site survey turns a preliminary or remote solar design into a project that can be permitted and built. Incomplete measurements, missing equipment information, or unclear photographs can lead to permit corrections, design revisions, equipment changes, inaccurate material estimates, and installation delays.
Companion Resource
Before completing the survey, review the GoGreenSolar DIY Solar Installation Guide for an overview of the planning, permitting, installation, inspection, and interconnection process.
This resource supplements—not replaces—the project-specific survey form, approved plans, manufacturer instructions, and local requirements.
Information to Capture
Property and Roof
Installation address and applicable authority having jurisdiction (AHJ)
Roof-covering type, approximate age, slope, number of stories, and visible condition
Dimensions and orientation of each proposed roof plane
Shading and obstructions, including ridges, hips, valleys, skylights, vents, chimneys, and other rooftop equipment
Distances to roof edges, ridges, valleys, and obstructions needed to evaluate applicable setbacks and access pathways
Attic access and visible framing information, including framing type, member size, spacing, span or support locations, direction, and apparent condition
Available structural or construction documents, when applicable
Any visible signs of leakage, sagging, deterioration, fire damage, or previous structural alterations
Electrical System
Utility provider, meter number, and other account information required for interconnection
Utility meter location and service configuration
Main service equipment manufacturer, model, listed rating, main-breaker rating, bus rating, and available breaker spaces
Clear photographs of equipment labels, the meter, service equipment, and panel directory
Subpanels, generators, transfer switches, existing solar or storage equipment, and other interconnected power sources
Proposed point of interconnection and any known utility-specific requirements
Keep electrical equipment covers closed unless an interior inspection is necessary and is performed by a qualified person using appropriate electrical-safety procedures. Unqualified persons should not remove covers or approach exposed energized components.
Equipment Locations and Routing
Proposed locations for inverters, batteries, combiners, disconnects, gateways, and other balance-of-system equipment
Required equipment access and working clearances
Wall construction, mounting surface, and surrounding environmental conditions
Approximate conduit and conductor routes, including estimated lengths
Attic, crawlspace, exterior-wall, trench, and roof-transition locations
Potential routing conflicts or concealed areas that could not be inspected
Internet, Wi-Fi, Ethernet, or cellular availability when required for commissioning or monitoring
Confirm that each proposed equipment location complies with the manufacturer’s installation instructions, the approved design, and applicable local requirements.
Photo Standards
Take photographs at three levels:
Wide views showing the building, roof planes, and overall equipment locations
Medium-distance views showing relationships between equipment, obstructions, and proposed routes
Close-ups showing labels, dimensions, construction details, and visible conditions
Keep photographs upright, well lit, in focus, and clearly labeled. Include a tape measure or other reliable scale where dimensions are important. Do not rely on photographs alone when a recorded measurement is required.
Example Completed Survey
Project: Sample Residence, 123 Example Lane
Roof: Composition shingles, approximately eight years old; 5:12 slope; two stories; no visible signs of active leakage at the time of the survey
Framing: Nominal 2 × 6 rafters spaced 24 inches on center and running from ridge to eave; visible condition documented
Main service equipment: Outdoor meter-main; 200-ampere bus rating; 200-ampere main breaker; two unused breaker spaces; manufacturer and model documented
Proposed array: South- and west-facing roof planes; one plumbing vent and one skylight measured and photographed
Proposed equipment location: North garage wall; mounting surface and required working clearances documented
Proposed conduit route: Roof junction box through the attic, then down the garage wall to the equipment; estimated route length of 55 feet
Special conditions: HOA review may be required; no existing generator observed; weak Wi-Fi signal at the proposed equipment location
Submission Checklist
Every required field is complete or marked “not applicable.”
Measurements use consistent units and identify how they were obtained.
Roof planes, obstructions, setbacks, and proposed array areas are documented.
Framing observations and available structural information are recorded.
Electrical-equipment ratings and labels are readable.
Photographs are upright, focused, labeled, and sufficient to establish context.
Proposed equipment locations and routing are clearly marked.
Existing solar, storage, generators, and transfer equipment are documented.
Safety hazards and inaccessible areas are identified.
Conflicts, discrepancies, and uncertainties are clearly noted rather than estimated or omitted.
A site survey records observed conditions; it does not replace structural analysis, electrical design, or field verification during installation. If actual conditions differ from the approved plans, obtain clarification or a design revision before proceeding.